Staying compliant with the EPA's BWON requirements and consent decrees require more than just sampling — it demands insight. BWON is designed to control benzene emissions from waste streams at facilities such as:
Facilities must determine whether they are subject to BWON based on the Total Annual Benzene (TAB) content in their waste streams. TAB is the total mass of benzene in all qualifying waste streams generated at a site. Expert sampling, testing, and analysis are critical to staying compliant.
RJ Lee Group provides real-time root cause analysis using our mobile laboratories equipped with PTR-TOF-MS and AIMS technology. These advanced analytical platforms detect and identify volatile organics, HAPs, and PFAS precursors at ultra-low part-per-trillion levels, allowing refineries and petrochemical facilities to rapidly pinpoint emission sources and maintain compliance with BWON (Benzene Waste Operations NESHAP) regulations and related Consent Decrees.
Facilities must identify and characterize all benzene-containing waste streams. This includes:
The variety of materials that must be tested requires a multi-disciplinary laboratory with the expertise and instrumentation to handle whatever a facility might encounter. Ongoing monitoring, maintenance, and reporting are critical elements of the requirement. Our proven field response teams have supported facilities nationwide with data transparency, defensible results, and actionable insights — helping clients meet EPA expectations and avoid costly downtime.
Advanced Instrumentation. Mobile Response. Defensible Data.
Learn more about RJ Lee Group’s capabilities today.